Commercial roofing work
- Low-slope roof leak investigation and repair
- EPDM, TPO, PVC, modified-bitumen, and built-up roof evaluation
- Roof coatings and restoration-candidate assessment
- Complete commercial roof replacement
- Ponding water, drains, scuppers, gutters, and drainage improvements
- Flashing around curbs, walls, parapets, penetrations, and rooftop equipment
- Preventive inspections, maintenance, documentation, and capital planning
- Multifamily, retail, office, industrial, municipal, and mixed-use roofs
Information that helps before the visit
- Building use, roof access, occupied areas, and property-manager contact
- Known roof system, approximate age, warranty information, and repair history
- Leak locations, weather timing, interior impact, and nearby rooftop equipment
- Plans for maintenance, restoration, replacement, solar, mechanical, or tenant work
Repair, restoration, or replacement
The decision depends on membrane and insulation condition, moisture extent, attachment, drainage, flashings, remaining service potential, warranty status, code requirements, and planned building use. A coating is not appropriate for every wet, poorly attached, or failing assembly.
Commercial proposal questions
- Is moisture scanning, test cutting, engineering, or hazardous-material testing required?
- How will occupants, entrances, vehicles, inventory, landscaping, and rooftop equipment be protected?
- What insulation, cover board, membrane, fastening, flashing, drainage, and warranty system is proposed?
- How are temporary water control, weather delays, hidden conditions, and change orders handled?
Treat the roof as an asset with a record, not an emergency
The economics of a commercial roof are different from a house. Water entering a low-slope assembly can saturate insulation across a wide area while producing very little visible interior evidence, and wet insulation does not dry — it stays wet, loses thermal value, corrodes deck, and expands the eventual replacement scope every season it remains. A leak that shows up as a stained ceiling tile in one office may sit above hundreds of square feet of compromised assembly.
The practical consequence is that record-keeping is a cost control. A dated leak log, photographs, repair invoices and roof-traffic records turn a vague argument about roof condition into a specific one, and it is what makes an intervention decision defensible to an owner, a board, or a lender.
- A leak log recording location, date, weather conditions, and what was done
- Records of rooftop equipment work, since HVAC traffic is a frequent source of damage
- Drain, scupper and overflow condition checked before and after leaf fall
- Seam, flashing, curb, and edge-metal condition documented over time
- Warranty terms, and what activity on the roof could void them
Repair, recover, coat, or replace
These are four different decisions and they are frequently presented as though they were points on one scale. Repair addresses defined failures in an otherwise serviceable assembly. Recovery installs a new membrane over the existing one, which is limited by how many layers already exist, by the condition and moisture content of what is underneath, and often by code. A coating is a maintenance and reflectivity measure appropriate to a sound substrate — applied over wet insulation, failed attachment, or an incompatible membrane, it buys very little and conceals what it is over. Replacement removes the assembly and starts again.
A moisture survey is the instrument that usually separates them, because whether the insulation is wet is the question that decides which options remain available. Ask what method a survey used, what its limits are, how the results were interpreted, and whether findings were confirmed by test cuts — a survey is evidence, not a verdict.
- How many membrane layers already exist, and what the code position is
- Whether a moisture survey was performed, by what method, and whether test cuts confirmed it
- Substrate, attachment method, insulation type and taper for any new assembly
- Drainage design, and whether ponding is being corrected or inherited
- Which warranty is offered — manufacturer system, material only, or contractor workmanship
Service information last reviewed August 16, 2026. Project acceptance, scheduling, and recommendations are confirmed by the roofing company.